loading

Midland Drive

 

This job called for exacting standards on grade through poor, shifting ground conditions.

With no room for error in the tight corridor, our team carefully guided an auger bore to place the new line. The 30” sewer pipe went through precisely to its intended target in spite of the wet, sandy soil.

See How We Did It

Guided Auger Boring